noaa pacific region center (prc) waterfront operations
Project Cost
$23.5M
Electrical Cost
$7.35M
Location
Ford Island, Oahu, Hawaii
MKE was responsible for the electrical design of two waterfront piers, a small boat ramp, and an office/warehouse building. Work included two new substations, modifications to an existing substation, shore power outlet assemblies, primary switching modifications, pier lighting, primary and secondary distribution, area lighting, inside and outside plant telecommunications design, and raceway infrastructure system to support and access the control system.